Thanks go out to everyone who helped on Monday and Tuesday! The mat frame and foam are installed. (But can’t be seen beause the canvas is covering them.) The canvas is laid out in preparation for trimming and sewing. Related posts: No related posts. Leave a Reply Cancel replyYou must be logged in to post a comment.